Packaging Line Removal & Installation

Overview:

Concept Projects Group successfully completed an automation project on behalf of Unilever UK. The goal was to design and install a new packaging line, aiming to double the volume output.

Scope Deliverables:

  • Project Management
  • Engineering design support to enable increased speed
  • Engineering support for increased digitalisation of existing area to line interface
  • Procurement of new suppliers, equipment and technologies
  • Removal of existing packaging line
  • Factory Acceptance Test (FAT) attendance
  • Installation of end-to-end fully automated high-speed packaging line
  • Site Acceptance Test (SAT) monitoring
  • Change and critical controls management
  • Health & Safety compliance
  • PUWER Assessment
  • Commissioning support
  • Snagging and sign-off

Result:

The project was completed on time, within budget, and with zero lost-time accidents. The new high-speed packaging line increased volume output by 100%.